Roll Back to DC from DR (Post Office) - DOP CBS Finacle EOD Instructions on 10th January 2023
Post Office: Roll back to DC (Data Centre) from the DR (Disaster recovery) on 10th January 2023 due to back end issues.
1. A decision has been taken to roll back to DC from the DR.
2. Hence it is requested to pass on this information for
your immediate action.
3. All post offices including NPOs should stop operations
immediately and do the Sol closure operations.
4. All unverified transactions should be verified and completed before 1600 hours today and first and second level of Sol closure should be ensured and completed before 1700 hours compulsorily.
5. Since the switch over requires minimum 10 hours window,
cpcs are requested to remain in office till such time DC closure 1st step is
completed.
Pl circulate this information down the po level immediately
and start your EOD activities right